Business Rules

The Description box must be completed prior to routing the document.

A status code must be entered/selected.

An agency must be entered/selected.

Entry of a project title is required. The user should enter the title as listed on sponsor forms.

Start and stop dates are required.

The direct cost amount is required. $0 is acceptable.

The indirect cost amount is required. $0 is acceptable.

A submission date is required.

A proposal type code is required.

A primary purpose code is required. There are seven options in the current table; however, there are only three options when the document is populated.

Entry of at least one project director is required and should be designated as the 'primary' project director.

More:

Routing